- 1、本文档共26页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
弱电程验收标准
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 26
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
- 建筑重机械维护与保养等管理制度.doc
- 建筑饰工程试卷.doc
- 建筑程招投标与合同管理任务及答案.doc
- 建筑饰工程施工合同乙种本.doc
- 建筑饰装修管理.doc
- 建设习型党支部打造学习型企业.doc
- 建筑程项目管理形成性考核册答案.doc
- 建管制度汇编模板.doc
- 建设位标准化管理正式稿.doc
- 建设位会计课件.doc
- 安图县农村低保政策实施:问题剖析与优化路径探寻.docx
- 六西格玛理论驱动下的质量成本优化与企业竞争力提升研究.docx
- 从国际经验到本土实践:我国水资源产权制度体系的构建与完善.docx
- 交流电机控制系统功率因数提升策略与实践研究.docx
- 图像纹理特征提取与力触觉表达:理论、方法与应用探索.docx
- 大规模空调负荷集群需求响应与优化互动的协同策略研究.docx
- 我国城市商业银行股权结构对效率的影响:理论与实证研究.docx
- 生态工业园共生网络:构建、运作与可持续发展探究.docx
- 篱架式滴灌下的枸杞生长密码:水肥调控与土壤微区环境的交互影响.docx
- 计算机类本科毕业论文-基于SpringBoot框架的酒店管理系统.pptx
文档评论(0)