- 1、本文档共14页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
战略销策划书
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 成本理在企业管理中的地位和作用.doc
- 成本算的方法根据企业生产产品的特点来定.doc
- 成招标投标新政策及招标采购风险防范与电子招标投标专题培训.doc
- 成房地产企业“营改增”影响及企业所得税管理后的涉税风险控制培训.doc
- 成本计习题总结含答案.doc
- 成本计教学大纲.doc
- 惠民程信息管理系统用户操作手册.doc
- 成本计A试卷及答案.doc
- 成本计补修作业答案.doc
- 成本计模拟试题.doc
- 2024-2030年中国半导体封装材料行业发展分析及投资价值评估研究报告.docx
- 2024-2030年中国半导体薄膜行业发展态势与盈利前景预测报告.docx
- 2024-2030年中国半导体用超纯水(UPW)行业竞争态势与投资盈利预测报告.docx
- 2024-2030年中国医药辅料行业市场发展分析及投资前景预测研究报告.docx
- 2024-2030年中国医用镍钛合金材料行业应用动态与未来运营规划研究报告.docx
- 2024-2030年中国即热式电热水器行业供需分析及需求发展前景预测研究报告.docx
- 2024-2030年中国医疗保健中的增强虚拟现实行业市场发展趋势与前景展望战略分析报告.docx
- 2024-2030年中国医疗垃圾车行业发展趋势及发展前景研究报告.docx
- 2024-2030年中国医疗床行业市场深度调研及发展前景与策略研究报告.docx
- 2024-2030年中国卵泡单位提取系统行业市场发展趋势与前景展望战略分析报告.docx
文档评论(0)