- 1、本文档共85页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
教务理信息系统实施设计方案
教务管理信息系统设计方案
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 82
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the part
您可能关注的文档
- 控制统分析与设计实验指导书更新.doc
- 控制统数字仿真第二章习题答案.doc
- 控制统的状态空间模型.doc
- 控制程基础实验指导书答案.doc
- 捷利技股份有限公司创业计划书.doc
- 控制货膨胀,不能简单以西方新自由主义理论为指导.doc
- 控制量技术要求.doc
- 控制钮和防爆现场操作柱按钮箱BZCADG价格.docx
- 控制统的频域分析.doc
- 控辍学相关制度修订版.doc
- 第12课 大一统王朝的巩固 课件(20张ppt).pptx
- 第17课 君主立宪制的英国 课件.pptx
- 第6课 戊戌变法 课件(22张ppt).pptx
- 第三章 物态变化 第2节_熔化和凝固_课件 (共46张ppt) 人教版(2024) 八年级上册.pptx
- 第三章 物态变化 第5节_跨学科实践:探索厨房中的物态变化问题_课件 (共28张ppt) 人教版(2024) 八年级上册.pptx
- 2025年山东省中考英语一轮复习外研版九年级上册.教材核心考点精讲精练(61页,含答案).docx
- 2025年山东省中考英语一轮复习(鲁教版)教材核心讲练六年级上册(24页,含答案).docx
- 第12课近代战争与西方文化的扩张 课件(共48张ppt)1.pptx
- 第11课 西汉建立和“文景之治” 课件(共17张ppt)1.pptx
- 唱歌 跳绳课件(共15张ppt内嵌音频)人音版(简谱)(2024)音乐一年级上册第三单元 快乐的一天1.pptx
最近下载
- 肝囊肿开窗引流术后护理查房.pptx
- 芯源微 -国内涂胶显影设备龙头, 国内涂胶显影设备龙头, 国内涂胶显影设备龙头, 布局化学清洗和 布局化学清洗和先进封装 先进封装 20240625 -西部证券.docx
- 2023-2024年EMS审核知识统考试题及答案汇总.pdf VIP
- 一种标示牌粘贴工具.pdf VIP
- DBJ50_T-157-2022 房屋建筑和市政基础设施工程施工现场从业人员配备标准.docx
- 云南省保山市隆阳区金厂河铜锌铁多金属矿矿床水文地质特征.doc VIP
- 电化学阻抗谱(EIS)原理及谱图分析.pptx
- 中班-科学-前进!磁力车(磁铁同极相斥、异极相吸)-课件(互动版).pptx
- 柳永《八声甘州》优质课件.ppt
- 道德与法治五年级上册第四单元传统美德 源远流长 教学设计.pdf
文档评论(0)