- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
新国贸易试题库
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 文化乐场所经营单位安全生产责任制度.doc
- 文化位安全生产管理制度.doc
- 文化司员工手册.doc
- 文化业管理相关知识.doc
- 文化媒公司招聘方案.doc
- 文化播公司与“购有趣”策划方案.doc
- 文化播有限公司公司章程.doc
- 文化播公司与合作方案.doc
- 文化媒公司LOGO设计创意例集锦.docx
- 文建工作法方案.doc
- 2025电信职业技能鉴定预测复习(名师推荐)附答案详解.docx
- 2025电信职业技能鉴定预测复习(名校卷)附答案详解.docx
- 2025电信职业技能鉴定题库【能力提升】附答案详解.docx
- 2025电信职业技能鉴定预测复习(培优A卷)附答案详解.docx
- 2025电信职业技能鉴定预测复习(A卷)附答案详解.docx
- 2025电信职业技能鉴定题库含完整答案详解【网校专用】.docx
- 2025电信职业技能鉴定预测复习附答案详解(研优卷).docx
- 2025电信职业技能鉴定题库检测试题打印及答案详解(精选题).docx
- 企业税收筹划绩效评价.pdf
- 2025电信职业技能鉴定题库检测试题打印及答案详解(全国通用).docx
文档评论(0)