- 1、本文档共24页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
施工全生产讲义
武汉一冶机电工程有限责任公司培训资料 主讲人:杨国庆
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 24
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number on
您可能关注的文档
- 新员入职培训流程附表格.doc
- 新员入职培训计划方案模板.doc
- 新员入职培训资料最新用.doc
- 新加奢侈品手表零售集团招聘外派普吉岛旗舰店销售专员上海.doc
- 新员入职培训计划方案.doc
- 新员入职培训规范.doc
- 新员岗前培训方案.doc
- 新员工入职培训转正流程.doc
- 新员总结评估表.doc
- 新员入职导向培训定稿.doc
- 2025电信职业技能鉴定通关考试题库附完整答案详解【历年真题】.docx
- 2025电信职业技能鉴定通关考试题库及答案详解【名师系列】.docx
- 2025电信职业技能鉴定通关考试题库及完整答案详解(历年真题).docx
- 2025电信职业技能鉴定通关考试题库及完整答案详解【全优】.docx
- 2025电信职业技能鉴定通关考试题库及完整答案详解【易错题】.docx
- 2025电信职业技能鉴定通关考试题库及答案详解(网校专用).docx
- 2025电信职业技能鉴定通关考试题库附答案详解【A卷】.docx
- 2025电信职业技能鉴定通关考试题库含完整答案详解【精选题】.docx
- 2025电信职业技能鉴定通关考试题库及完整答案详解【历年真题】.docx
- 2025电信职业技能鉴定通关题库含完整答案详解【名校卷】.docx
文档评论(0)