- 1、本文档共47页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
旅游观公路绿化施工组织设计secret
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 施工场安全生产目标定.doc
- 施工场安全管理制度.doc
- 施工场安全生产规章制度.doc
- 施工包商考核管理办法.doc
- 施工场安全管理体系.doc
- 施工场安全生产管理体系资料手册.doc
- 施工场管理人员职责.doc
- 施工场重大危险源辨识与监控措施doc.doc
- 施工境保护与水土保持管理方案.doc
- 施工场安全生产管理资料.doc
- 共享厨房行业法律法规完善与风险防范报告2025.docx
- 在集团推进精益化生产和精细化管理工作动员大会上的讲话.pptx
- 在某某乡镇消防安全工作会议上的讲话.pptx
- 责任督学劳动教育督导典型案例.pptx
- 在环境保护“一法一条例”执法检查动员会上的讲话(摘要).pptx
- 装备制造业2025年自主创新能力提升与产业链优化报告.docx
- 智能家居系统互联互通标准与产业推进:2025年技术创新与应用前景.docx
- 在全县基础免疫二连疫苗查漏补种业务培训会上的讲话.pptx
- 增进民生福祉提高人民生活品质PPT始终把最广大人民群众的根本利益放在心上PPT课件(带内容).pptx
- 西餐原材料培训.pptx
文档评论(0)