- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
机关办工作职责
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 最新改的房务部过程管理细则.doc
- 最新程钢柱垂直度测量方法.doc
- 最新界抗体公司.doc
- 最新河南省固定资产投资项目节能评估规程.doc
- 最新确版JGJ建筑施工安全检查标准评分表全套.doc
- 最新版安全生产法律法规清单.doc
- 最新草累强制性国家、行业标准清单.docx
- 最新营企业劳动合同样本免费.doc
- 最新资分析形成性考核作业及答案.doc
- 最新车覆盖件冲压成形模具设计制造与组合装配工艺技术手册.docx
- 2025年湖北轻工职业技术学院单招语文测试题库及答案一套.docx
- 2025年湖北省宜昌市单招(语文)测试模拟题库完整.docx
- 2025年湖北省襄樊市单招语文测试模拟题库及参考答案.docx
- 4.2特异性免疫(第1课时)(教学课件)-高二上学期生物人教版选择性必修.pptx
- 6.1让我们选择坚强.ppt
- 高三化学一轮复习限定条件的同分异构体的数目与书写课件.pptx
- 21.2.4一元二次方程的根与系数的关系课件人教版数学九年级上册(1).pptx
- Module5Unit2It'stoobigforyou(课件)-外研版(2012)英语五年.pptx
- 23.1.1图形的旋转1课件人教版数学九年级上册.pptx
- 运动的描述课件.ppt
文档评论(0)