- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
甲方场管理制度
巴中正和房地产开发有限公施工管理制度
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 24
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel pa
您可能关注的文档
最近下载
- 税务发票管理培训课件.pptx VIP
- STEMI诊断和治疗指南解读—STEMI患者的急诊救治.pdf
- 重庆专升本数学2014-2025年真题试卷及答案汇总.docx VIP
- 2025年医疗卫生系统招聘考试(护理学)考前冲刺试题及答案.docx VIP
- (完整版)初中数学新课程标准(2011版)测试题(有答案)2021.docx
- 化学高考命题方向与复习策略(夏建华).ppt VIP
- 半导体级四氯化铪的制备方法.pdf VIP
- 冲刺2025年高考大题突破得高分系列 化学03 化学反应原理综合题(逐空突破)(解析版).docx VIP
- 2024-2025学年上海师范大学附属中学高三入学调研英语试题(1)试卷含解析.doc VIP
- 冲刺2025年高考大题突破得高分系列 化学02 化学实验综合题(逐空突破)(解析版).docx VIP
文档评论(0)