- 11
- 0
- 约5.69万字
- 约 49页
- 2017-04-21 发布于辽宁
- 举报
地区中小学扩建项目建设可行性研究报告(学校扩建项目建设可行性研究报告,建设可行性研究报告)
away. One-third of the nation felt it .A huge crack that was eight kilometres long and thirty metres wide cut across houses,roads and canals.Steam burst from holes in the ground. Hard hills of rock became rivers of dirt. In fifteen terrible seconds a large lay in ruins.The suffering of the people was extreme. Tow-thirds of them died or were injured during the earthquake.Thounds of families were killed and many chidren were left without parents. The number of people who were killed or injured reached more than 400,000.?But how could the survivors believe it was natural?Everywhere they looked nearly everything was destroyed. All of the city’s hospitals,75%of its factories and buildings and 90%of its homes were gone. Bricks covered the ground like red autumn leaves. No wind, however,could below they away. Two dams and most of the bridges also fell or were not safe for travelling. The railway tracks were now useless pieces of steel. Tens of thousands of cows would never give milk again. Half a million pigs and millions of chickens were dead. Sand now filled the wells instead of water. People were shocked. Then later that afternoon,another big quake which was almost as strong as the first one shook Tangshan. Some of the rescue workers and doctors were trapped under the ruins. More buildings fell down. Water,food, and eletricity were hard to get. People began to wongder how long the disater would last.? All hope was not lost. Soon after the quakes, the army sent 150,000 soliders to Tangshan to help the rescue workers. Hundreds of thousands of people were helped. The army organized teams to dig out those were trapped and to bury the dead. To the north of the city, most of the 10,000 miners were rescued from the coal mines there. Workers built shelters for survivors whose homes had been destroyed. Fresh water was taken to the city by train,truck and plane. Slowly, the city began to breathe again. ?A SAFE HOME? It is sad but that people die in earthquakes from falling furni
您可能关注的文档
- 4万亩紫花苜蓿基地项目建设可行性研究报告.doc
- 8英寸集成电路芯片项目建设可行性建设环境影响论证评价报告.doc
- 3万吨=年城市餐后油转化生物柴油项目建设可行性研究报告-优秀甲级资质建设可行性研究报告92页.doc
- 15万立方米加气砼(混凝土)项目建设可行性研究报告.doc
- 10万吨=年聚丙烯装置建设可行性研究报告.doc
- 20万吨=年气体分离装置技术改造项目建设可行性研究报告-优秀甲级资质建设可行性研究报告.doc
- 20万吨年电石项目建设环境影响论证评价报告(报批稿).doc
- 20万吨=年尿素技改工程建设可行性研究报告-122页优秀甲级资质建设可行性研究报告.doc
- 71省道复线及连接线公路工程项目建设可行性项目建设环境影响论证评价报告.doc
- 57省道暨文青公路改建工程建设环境影响论证评价报告.doc
- 山东省惠民县2026届中考语文全真模拟试卷含解析.doc
- 四川省成都市邛崃市达标名校2026届中考语文考前最后一卷含解析.doc
- 期海南省海口五中2026届中考历史四模试卷含解析.doc
- 山东省青岛5中2026届中考历史对点突破模拟试卷含解析.doc
- 黑龙江哈尔滨道外区重点名校2026届中考猜题语文试卷含解析.doc
- 广东省汕尾市海丰县重点名校2026届中考英语五模试卷含答案.doc
- 2026届北京市崇文区重点达标名校中考五模语文试题含解析.doc
- 河南省周口市川汇区18中2026届中考历史押题试卷含解析.doc
- 2026届山东省高青县中考语文模拟试题含解析.doc
- 安徽省合肥市庐江县2026届中考历史最后一模试卷含解析.doc
最近下载
- 人教版五年级下册数学全册教案(表格式).doc
- 电力产业安全生产标准化管理体系 基础及总要求.pdf VIP
- 2024年面向多场景应用的光网络通感一体化架构和关键技术方案研究报告.pdf VIP
- 辽宁省七校协作体2024-2025学年高一下学期3月联考语文答案.docx VIP
- 2026春新人教版数学二年级下册全册教学课件.ppt
- 可靠性课件PPT教学课件.pptx VIP
- [全]学生硬笔作品纸-古诗词书法比赛用A4纸打印模板.docx VIP
- De'miei bollenti spiriti O mio rimorso 激动沸腾的心灵 噢我的悔恨 C调正谱 (原文)).pdf VIP
- 提升绿色施工技术应用的培训方案.pptx VIP
- 2025年互联网营销师广告投放平台ROI数据对接与处理专题试卷及解析.pdf VIP
原创力文档

文档评论(0)