- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
船舶炉安全操作规定
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 自动制原理第一章绪论.doc
- 自动的喷水灭火装置技术规范.doc
- 自动的喷水灭火装置认证技术规范.doc
- 自动制理论课件ch.doc
- 自动水灭火系统设计规范讲义.doc
- 自动立体仓库信息管理与监控系统.doc
- 自动制理论实验教案新.doc
- 自动制原理试卷、习题及答案套.doc
- 自动系统管理办法暂行.doc
- 自学试《创业理论与实务》复习提纲.doc
- 2023宁夏灵武宁东能源化工基地“百企千岗”网络招聘2023年第4期(一)笔试参考题库附带答案详解.doc
- 矩阵理论 课件 第2章第2节线性子空间.pptx
- 二零二五年度科技园区投资借贷合同协议.docx
- 2023安徽合肥公交集团有限公司招聘30人笔试参考题库附带答案详解.doc
- 矩阵理论 课件 第2章第4-5节线性变换值域、核及不变子空间~线性空间的同构.pptx
- 2023国网重庆市电力有限公司校园招聘约65人(第一批)笔试参考题库附带答案详解.doc
- 2020-2021学年内蒙古赤峰二中高二上学期第二次月考生物试题 Word版.docx
- 2023国网陕西电力省管产业单位供电服务业务部招聘(379人)笔试参考题库附带答案详解.doc
- 矩阵理论 课件 第1章第1节矩阵的初等变换.pptx
- 2023国网甘肃省电力公司高校毕业生招聘367人(第一批)笔试参考题库附带答案详解.doc
文档评论(0)