- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
项目理成熟度模型与组织竞争力
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 集团司能源使用管理制度.doc
- 集团司开展管理提升活动实施方案.doc
- 集团司薪酬方案.doc
- 集团司印章使用管理制度.doc
- 集团司的电子商务网站策划与设计论文.doc
- 集团司绩效考核各部门发展规划整理.doc
- 集团司金秋客户答谢会策划案.doc
- 集团户市场营销传播方案.doc
- 集团司财务管理办法.doc
- 集团司采购管理制度.doc
- 山东聊城市文轩中学2026届数学八年级第一学期期末统考试题含解析.doc
- 安徽省芜湖市繁昌县2026届八年级数学第一学期期末预测试题含解析.doc
- 辽宁省锦州市凌海市2026届九年级数学第一学期期末调研模拟试题含解析.doc
- 江苏省泰州市姜堰区2026届八年级数学第一学期期末考试模拟试题含解析.doc
- 2026届广西桂林市灌阳县数学九上期末经典试题含解析.doc
- 安徽省马鞍山市2026届数学八上期末达标检测模拟试题含解析.doc
- 山南市重点中学2026届数学八年级第一学期期末学业水平测试模拟试题含解析.doc
- 种子预约生产合同协议书(精选).doc
- 石材买卖(合同)与石材买卖(合同)范本.doc
- 六、劳动合同书(16页版本).doc
原创力文档


文档评论(0)