- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
『润联网』
登录【润联网】查询价格
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts
您可能关注的文档
- +BC电子商务物流配送模式分析以苏宁易购带为例.doc
- +义务教育实施细则.doc
- ,不合格账户或成批提前中止交易.doc
- ,应化标准团支部申请材料.doc
- A 决胜终端 提升业绩2.doc
- Acrel用户变电站综合自动化系统.doc
- Acrel电力监控系统在青岛橡胶谷的应用方小燕.doc
- AEG UPS电池的储存安装和维护.doc
- APB税控器网报流程操作流程.doc
- App 暖通专业风管水管材料一览表.doc
- DB32T3444 健康企业评估规范.pdf
- DBJ25-82-2000 甘肃省聚苯板外保温墙体设计与施工规程 甘肃省地方标准.pdf
- DB32T-核与辐射突发事件卫生应急处置技术规范 第3部分:现场流行病学调查及编制说明.pdf
- DB44T1430-2014 冷冻水产品流通冷链管理技术规范.pdf
- TCASME-监控系统安装与维护规范.pdf
- TCSAE-汽车远程升级(OTA)信息安全测试规范.pdf
- TJSSAE-智能网联汽车开放道路测试管理要求及编制说明.pdf
- TEERT-挥发性有机物污染治理设施工况自动监控技术规范.pdf
- TCASME-三跨连续节段梁悬浇施工技术规范.pdf
- DB36T-行政执法案卷评查规范编制说明.pdf
最近下载
- (完整版)初三化学方程式大全.pdf
- 卫健委临检中心 15项临床检验质量控制指标——解读与应用.pptx VIP
- GB/T 14165-2008_金属和合金 大气腐蚀试验 现场试验的一般要求.pdf
- NB∕T11502-2024光伏光热一体组件和空气源热泵联合热水系统通用技术条件.pdf
- 抖音粉丝群体数据分析报告.pptx
- 【国家标准】QBT 3826-1999 轻工产品金属镀层和化学处理层的耐腐蚀试验方法 中性盐雾试验(NSS)法.pdf
- 足部特效反射区疗法一览表 附足底穴位图.doc
- 按次收费合同5篇.docx VIP
- 棋类运动协会章程.docx
- 口腔科的2024年工作总结6篇.docx VIP
文档评论(0)