多媒体技术应用模拟卷十四
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs
您可能关注的文档
最近下载
- 中药生产企业多品种共线生产风险评估报告.docx VIP
- 旅游开发与规划第八章 旅游规划理论与方法.pptx VIP
- TCECS 596-2019 灌注桩成孔质量检测技术规程.pdf VIP
- 全文可编辑-建筑材料行业市场前景及投资研究报告:电子布,算力时代,PCB关键基材,周期品,成长品.pptx VIP
- 南京十三五电网发展规划 环境影响评价信息公示.PDF VIP
- 广东营造林工程定额与造价标准(修改)(整理).docx
- 孕期的监护与保健-PPT幻灯片.ppt VIP
- 人教版九年级上册化学单元达标练习试题及答案(全册).doc VIP
- CJ_T 521-2018 生活热水水质标准.docx VIP
- 冬季施工方案.docx VIP
原创力文档

文档评论(0)