- 1、本文档共11页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installa
您可能关注的文档
- 基于PLC的立体车库的设计 副本.doc
- 境外意外保险说明.doc
- 基于时间最优的二维运动龙门起重机系统鲁棒性能分析张雄义.doc
- 基于矿用瓦斯检测报警器软件设计.doc
- 增值税消费税营业税税法作业及答案.doc
- 增效扩容改造设计.doc
- 增值税营业税消费税新三税详解.doc
- 填写国家自然科学基金申请书应该注意的一些细节[].doc
- 声光报警器和防爆广播报警器价格.docx
- 增值税法完整版.doc
- 《知到萌宠养成记》智慧树单元测试题答案.pdf
- 2024年广西初中学业质量测评模拟语文试题(A)[含答案].pdf
- 72乙烯与有机高分子材料第2课时-浙江大学附属中学高中化学人教版.pptx
- 2025年PP改性新材料项目绩效评估报告.docx
- 2024年秋季新版人教版八年级上册物理课件 第五章第3节 凸透镜成像的规律5.3-2凸透镜成像规律的应用.pptx
- 2024年广西初中学业质量测评模拟语文试题(B)[含答案].pdf
- 《练习七》人教版五上数学教学设计及反思.pdf
- 2025年锌合金车仔项目可行性研究报告.docx
- 《电气控制与plc应用技术》课程标准.pdf
- 2024年惠州工程职业学院高职单招语文历年参考题库含答案解析.docx
文档评论(0)