- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
徐州区联想旗舰店
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installa
您可能关注的文档
- 山东省固定源大气颗粒物综合排放标准DB.doc
- 山东省昌乐外国语学校邵秀芹的第四届全国“教学中的互联网应用”教案评选《师爱助我成长我爱我师》.doc
- 山东省东营市城市居民服务性消费情况.doc
- 层电梯的plc设计.doc
- 山东省区域性大气污染物综合排放标准DB.doc
- 山东省枣庄市第四十二中学八级政治上册《做个聪明的消费者》教案新人教版.doc
- 山洪灾害临界雨量分析计算gao.doc
- 山东省价格鉴定案卷文书格式示范文本.doc
- 山东省自然科学杰出青基金申请书.doc
- 山东省区域性大气污染物综合排放标准DB1.doc
- 高中历史课堂校园环境布置对学生历史知识记忆效果的影响分析论文.docx
- 小学英语口语交际能力培养与课堂互动策略研究论文.docx
- 基于网络直播的高中生跨学科学习模式研究论文.docx
- 小学历史自然拼读法在史实讲解中的应用研究论文.docx
- 小学低年级学生行为习惯养成与教师教学技能的研究论文.docx
- 英语学习动机与学业成就的关系研究论文.docx
- 初中校园文化建设与青少年身心健康发展的关联研究论文.docx
- 小学科学教育中社会性议题的探究式教学研究论文.docx
- 小学语文“语言文字积累与梳理”任务群在小学语文课堂管理中的应用论文.docx
- 高中化学实验:雨水pH值变化与大气中氮氧化物对植物生长影响研究论文.docx
文档评论(0)