- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
方案 关于夯实发展型党组织基层基础的实施方案
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 16
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
- 拆迁法律业务操作指引.doc
- 招厨房收纳方法 还你整洁生活.doc
- 招紧致腿部肌肉 修长美腿练出来.doc
- 招金矿业滴水铜矿信息网络方案书修改版.doc
- 招投标第一标段.doc
- 招聘计划样表.doc
- 拨叉机床夹具的项目设计.doc
- 挂件产品外观标准亿瑞.doc
- 挑战杯金奖作品优秀案例.doc
- 拓展训练基地建设方案.doc
- 2024年人教版中学七7年级下册数学期末试卷(附答案) .pdf
- 2024届湖南省长沙市初中学业水平全真模拟考试语文试题(含答案).pdf
- 2024六年级上册数学专项练习题期末试卷 .pdf
- 2024-2025学年度小学实验教学工作计划标准模板(4篇) .pdf
- 2024届高考语文复习:作文主题训练乡土中国(含解析).pdf
- 2024届河南省部分高三语文上学期9月质量检测联考卷附答案解析.pdf
- 2024充电桩销售安装合同 .pdf
- 2024年中级会计职称之中级会计实务高分题库附精品答案 .pdf
- 2024年中级注册安全工程师之安全生产管理基础试题库和答案要点.pdf
- 2024安全生产承诺书模板集合9篇【整合汇编】.pdf
文档评论(0)