- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
江西华图微信号:jxhuatu
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color a
您可能关注的文档
- 毕业论文 装潢 杨志.doc
- 比马尔代夫还要美的岛马来西亚卡帕莱旅游指南.doc
- 毕业论文撰写实施方案修订.doc
- 毕业论文专利池及其发展的分析.doc
- 毕业论文太阳能光伏发电系统研究 副本.doc
- 森林防火监控智能分析系统热成像.doc
- 毕业论文数控机床常见故障的维修.doc
- 模块五 网页设计简约篇.doc
- 武汉汽车改装凯迪拉克XTS加装全景案例.doc
- 毕业论文应化李明轩.doc
- 河南省信阳市示范名校2025届高考考前提分化学仿真卷含解析.doc
- 辽宁省沈阳二中2025届高三一诊考试生物试卷含解析.doc
- 《特种设备重大事故隐患判定准则》GB 45067-2024知识培训.pptx
- 《颅脑损伤患者的护理诊断与护理措施》知识培训.pptx
- 福建省莆田第十中学2025届高考压轴卷化学试卷含解析.doc
- 江苏省沭阳县修远中学2025届高考仿真模拟生物试卷含解析.doc
- 《混凝土坝分布式光纤测温施工技术规范》知识培训.pptx
- 《保险业车型识别编码规则》GBT 44892-2024知识培训.pptx
- 2025届新疆维吾尔自治区喀什二中高三第一次调研测试生物试卷含解析.doc
- 新疆奎屯市一中2025届高三下学期一模考试生物试题含解析.doc
文档评论(0)