- 1、本文档共19页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 热电钢结构吊装专项方案.doc
- 源盛国贸中心营销方案.doc
- 热轧无缝钢管[热轧无缝钢管价格].doc
- 煤炭行业策略研究第期1.doc
- 煤矿项目建设流程[].doc
- 煤炭行业策略研究第期.doc
- 澳门自助旅游攻略路书蚂蜂窝.doc
- 煤矿物资手册共分册.doc
- 煤矿可研徐总安排.doc
- 煤矿地质学教案.doc
- 高中生涯规划教育在生物学科生命科学实验探究中的实践应用案例分析教学研究课题报告.docx
- 2023年福建省南平市浦城县万安乡招聘社区工作者真题带答案详解.docx
- 2023年福建省南平市武夷山市新丰街道招聘社区工作者真题及参考答案详解1套.docx
- 《基于VR的施工现场安全管理模拟系统设计与评估研究》教学研究课题报告.docx
- 工程管理中的合规性分析.docx
- 小学科学实验:校园树木病虫害防治的物理防治技术探究与应用教学研究课题报告.docx
- 《智能电网故障诊断与预测中的机器学习在分布式能源集成中的应用》教学研究课题报告.docx
- 《基于人工智能的新冠肺炎康复期肺功能恢复预测模型研究新进展》教学研究课题报告.docx
- 《农业面源污染治理生态缓冲带技术对农业生态系统服务功能的影响研究》教学研究课题报告.docx
- 《人工智能优化的图像风格迁移在图像内容审核中的应用与挑战》教学研究课题报告.docx
文档评论(0)