- 1、本文档共33页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 特殊教育专业本科阅读书目.doc
- 猪流感甲型HN型流感.doc
- 独立学院的可持续发展.doc
- 独立型离网型光伏系统.doc
- 王家荣宝供十大事记.doc
- 王家荣便利店的发展特征与趋势.doc
- 王家荣TPM基础资料.doc
- 王家荣世界汽车业强国地位的演变及其对我国的启示.doc
- 王家荣西门子核心能力字典.doc
- 王志纲迎接泛地产时代的挑战.doc
- 湖南省长沙麓山国际实验学校2024-2025学年高一下学期3月月考数学试题.pdf
- 2024人才培养方案艺术设计专业.docx
- 湖北省十堰市六县市区一中教联体2024-2025学年高二下学期3月联考数学试题.pdf
- 江苏省南京市第一中学2024-2025学年高一下学期3月月考检测数学试题.pdf
- 理工光电学院at89s52单片机与dac adc接口.pptx
- 云南省红河哈尼族彝族自治州第一中学2024-2025学年高一下学期3月月考数学试题.docx
- 广西玉林市2018年中考化学真题试题(含解析).pdf
- 2024中考百日誓师大会方案.docx
- 基于肠道菌群的代谢性疾病诊断与治疗靶点筛选研究资料集.docx
- 引力波探测与数据分析中的自适应滤波与波束成形技术研究与应用资料集.docx
文档评论(0)