- 1、本文档共23页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
相对论与惯性系及光速不变修改一
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 生活小妙招一般人我不告诉他.doc
- 申报海洋可再生能源专项资金项目.doc
- 申克表中文说明书.doc
- 用友T案例集.doc
- 申请书和总结的写作.doc
- 申银万国申银万国综合版.doc
- 电信业随想二.doc
- 申请汽车S店建店资料.doc
- 电动车新政策.doc
- 电商冲击传统零售业 KM逆流而上获消费者青睐.docx
- 政府行业信息化建设与管理云平台解决方案.doc
- 网络直播营销策划及实施细则.doc
- 电子商城平台运营策略及用户体验提升研究.doc
- 石油化工行业安全环保管理方案.doc
- 航空工业无人机技术研发应用方案.doc
- 1.2空间向量基本定理-2024-2025学年高二上学期数学人教A版(2019)选择性必修第一册.pptx
- 1.3空间向量及其运算的坐标表示课件-2024-2025学年高二上学期数学人教A版(2019)选择性必修第一册.pptx
- 4.3.2等比数列的前n项和公式课件-2024-2025学年高二上学期数学人教A版(2019)选择性必修第二册.pptx
- 新疆吐鲁番市高昌区二中2025届高三下学期第五次调研考试历史试题含解析.doc
- 广东省深圳市2025届高三第一次模拟考试历史试卷含解析.doc
文档评论(0)