- 1、本文档共155页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
PAGE 154
百花时代广场工程项目
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 154
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts
您可能关注的文档
- 申报海洋可再生能源专项资金项目.doc
- 申克表中文说明书.doc
- 用友T案例集.doc
- 申请书和总结的写作.doc
- 申银万国申银万国综合版.doc
- 电信业随想二.doc
- 申请汽车S店建店资料.doc
- 电动车新政策.doc
- 电商冲击传统零售业 KM逆流而上获消费者青睐.docx
- 电器物料编码原则1.doc
- 标准化基础知识培训教材.pptx
- 加强业务培训.pptx
- 医疗保健内部审计师协会AHIA应急管理洞察从内部审计角度看恢复过程中的准备工作英文版15页.pdf
- 爱尔眼科医院集团股份有限公司2022年年度报告374页.PDF
- 爱博医疗-高成长的眼科器械龙头研发创新打开市场空间-21081178页.pdf
- 电子行业磁性元器件深度报告乘新能源之风磁性元器件破竹建瓴-23021347页.pdf
- 特立独行一代深度解读95后互联网生活方式33页.pdf
- 新凤鸣-公司研究报告-稳步成长的涤纶龙头景气度触底反弹-23022617页.pdf
- OLED行业深度报告全行业供需结构逐步优化中国厂商赢得优势-24081368页.pdf
- 公司研究东方盛虹-公司研究报告涤纶DTY龙头大炼化项目完善全产业链布局21页.pdf
文档评论(0)