- 1、本文档共24页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
综超门店防损手册do标c
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 系统的频率响应和稳定性三.doc
- 红玫瑰大酒店建筑电气设计案例[].doc
- 索迪迈公交巴士车载无线G监控方案.doc
- 素食生活不完全手册.doc
- 红宝书期权分析及策略交易.doc
- 约瑟夫熊彼特介绍生平+理论+一本著作.doc
- 级国贸会话与洽谈.doc
- 级临床医学本科含各专业方向病理学实习教案学时.doc
- 级人才培养方案新版.doc
- 级学生暑期社会实践调查活动实施方案.doc
- 2024年吉林省公务员考试行测真题参考答案详解.docx
- 2024年吉林省公务员考试行测真题及一套参考答案详解.docx
- 2024年吉林省公务员考试行测真题及1套参考答案详解.docx
- 小学美术教育人工智能学习资源推荐中的冷启动问题与解决方案教学研究课题报告.docx
- 2024年吉林市公务员考试行测试卷历年真题附答案详解(考试直接用).docx
- 2024年吉林市公务员考试行测试卷历年真题附答案详解(突破训练).docx
- 《基于服务质量提升的会展服务企业服务品牌战略规划研究》教学研究课题报告.docx
- 2024年吉林省公务员考试行测真题及答案详解(夺冠).docx
- 2024年吉林省公务员考试行测真题及答案详解(夺冠系列).docx
- 湘教版八年级下册数学精品教学课件 第2章 四边形 专题训练5-构造中位线的常用方法.ppt
文档评论(0)