- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
赢得客户忠诚的五个要诀 下篇
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 西安市历房地产政策回顾及政策解读与预测.doc
- 西宁营业执照检网上申报系统操作流程.doc
- 西安建筑科技大学华清学院概况.doc
- 西安西高新开发区酒店推荐及介绍.doc
- 西爱分享大大小小种厨房装修经验.doc
- 西式快餐解决方案.doc
- 西亚斯国际学院十五周校庆.docx
- 西经 无敌笔记 超强总结.doc
- 西泉眼水库夏季浮游动物群落结构特征与水质分析应用生态学报版.doc
- 西门子防爆电机和单项防爆电机价格.docx
- 2025年工业机器人产业在新能源电池行业应用前景研究报告.docx
- 露营地生态保护与社区共建2025年行动计划报告.docx
- 2025年工业互联网平台在基础设施建设中的应用可行性研究报告.docx
- 2025年跨境电商物流行业物流行业物流配送模式创新研究报告.docx
- 露营地生态保护与社区共建可持续发展模式报告.docx
- 2025年互联网医疗行业发展趋势与商业模式研究报告.docx
- 2025年生物制造产业生物制药行业市场前景与竞争格局分析报告.docx
- 普惠金融在绿色信贷领域的实践与未来五到十年趋势报告.docx
- 跨境电商2025年法国市场营销中心战略布局分析报告.docx
- 全渠道零售企业运营效率提升与优化案例.docx
文档评论(0)