- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
业讯通综营销方案
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 上海期货易所上市品种介绍.doc
- 上海检验医生信息.doc
- 上岛自选锁超市.doc
- 上海期货易所螺纹钢期货简介.docx
- 上海市自基金申报书.doc
- 上海苏州州自助旅游攻略.doc
- 上消化道血病人的护理.doc
- 上消化道血临床路径.doc
- 上消化道血病历.doc
- 上消化道血的护理查房.doc
- 2024-2025学年四川省眉山市仁寿县校际联考高一下学期6月期末考试政治试题(解析版).docx
- 2024-2025学年安徽省合肥市庐江县高一下学期期末教学质量检测政治试题 (解析版).docx
- 2024-2025学年河南省郑州市高一下学期期末考试政治试卷(解析版).docx
- 2024-2025学年北京市大兴区高一下学期期末检测l历史试题(解析版).docx
- 2024-2025学年河南省杞县高中高一下学期6月月考政治试题(解析版).docx
- 我是一名共产党员.docx
- 永葆党员本色勇担时代使命——一名共产党员的初心与担当.docx
- 《王阳明心学》导读.docx
- 2023年至2024年交管支队物业服务项目公开招标文件.PDF
- 红河县移民就业培训中心建设项目可行性研究报告.docx
最近下载
- ICD-10消化系统疾病分类解析.pptx VIP
- 13G322-1~4钢筋混凝土过梁(2013年合订本).docx VIP
- 高考数学模拟卷.pdf VIP
- 数学人教版六年级下册《图形的认识与测量(一)》教学设计.doc VIP
- 钢结构工程施工质量控制ppt培训.pptx VIP
- 常州星河灯具报价清单.xls VIP
- 截止阀安装使用说明书-ArmstrongInternational.PDF VIP
- 人教版小学英语PEP五年级上册英译汉课文翻译(三起点).docx VIP
- 小升初暑假讲义17 《西游记》1 (教师版).doc VIP
- 2025年党员领导干部学习《党政机关厉行节约反对浪费条例》研讨会交流发言1.docx VIP
文档评论(0)