- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中医肿瘤复习资料
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installa
您可能关注的文档
- 东南大学力系统保护第一次作业.doc
- 东北师范学网络教育毕业论文格式示例.doc
- 业讯通综营销方案.doc
- 东台中学生日常消费情况的调查研究doc.doc
- 东方雅苑期物业服务合同.doc
- 东海县安山水库.doc
- 东海山庄销推广方案.doc
- 东南亚风冰饮节活动策划案.doc
- 东财《保学概论X》在线作业二.doc
- 东平县国局岗位风险防范手册[定稿].doc
- 2024年河南省社旗县人民医院公开招聘医务工作人员试题带答案详解.docx
- 2022年贵州省黔东南州中考道德与法治真题(原卷版).pdf
- 2024年河南省上蔡县人民医院公开招聘医务工作人员试题带答案详解.docx
- 2025秋人教版地理八年级上册《第二章 中国的自然环境》大单元整体教学设计[2022课标].pdf
- 2024年山东省沂源县人民医院公开招聘医务工作人员试题带答案详解.docx
- 2024年河南省嵩县人民医院公开招聘医务工作人员试题带答案详解.docx
- 2024年河南省沈丘县人民医院公开招聘医务工作人员试题带答案详解.docx
- 2024年河南省睢县人民医院公开招聘医务工作人员试题带答案详解.docx
- 2022年贵州省铜仁市中考地理试题(原卷版).pdf
- 2024年河南省遂平县人民医院公开招聘医务工作人员试题带答案详解.docx
文档评论(0)