- 1、本文档共14页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
交互电子板多媒体教室方案推荐
科技改变生活
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by s
您可能关注的文档
- 主流手机商品牌竞争力解析.doc
- 主持人开白台词精选,超级全哦.doc
- 久咳嗽不的药方.doc
- 丽江市地系统纳税服务平台暨财税库银横向联网操作流程指南.doc
- 义乌市稠街道办事处防震减灾预案.doc
- 乌兰察布青川农牧业猪场.doc
- 乌鲁木齐交线路.doc
- 乌鲁木齐交路线1.doc
- 乌鲁木齐州大酒店.doc
- 乐亭县突特色加快旅游业发展纪实.doc
- grace作业团体课程.pdf
- 资料snrf51422发行说明snrfotes.pdf
- 关卡恶搞版游戏介绍.pdf
- 数字信号处理与控制老师ch4e.pdf
- 章因素模型套利定价理论.pdf
- effect-of oriented fiber membrane fabricated via needleless melton water filtration efficiency desalination40效应纤维制造纯净无熔体在水中效果效率.pdf
- 文稿说明介绍2017 contempvolpi contemporary mood web.pdf
- 项目大计划二小组有点复杂线程池.pdf
- 使用brad larsen http生成电源表器手指湖奖金轨道tommy-emmanuel the finger lakesTommy.pdf
- 对乙酰氨基酚测定报告assay demo.pdf
文档评论(0)