- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
以农为特,打造精品农家乐品牌
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 产业结构业论文初稿 副本.doc
- 产业结构评价方法.doc
- 产业转移资源跨区域调配.doc
- 产品促销计方案.doc
- 产品与渠案例分析.doc
- 产品初步计说明书.doc
- 产业集群争力的影响因素及提升路径研究.doc
- 产业聚集势分析.doc
- 产品外观验技术要求.doc
- 产品外观验标准.doc
- 2024年湖南省古丈县公开招聘合同制交警试题带答案详解.docx
- 2024年甘肃省肃南裕固族自治县公开招聘合同制交警试题带答案详解.docx
- 2024年甘肃省西和县公开招聘合同制交警试题带答案详解.docx
- 2024年甘肃省夏河县公开招聘合同制交警试题带答案详解.docx
- 2024年甘肃省武山县公开招聘合同制交警试题带答案详解.docx
- 2024年甘肃省天祝藏族自治县公开招聘合同制交警试题带答案详解.docx
- 2024年甘肃省永昌县公开招聘合同制交警试题带答案详解.docx
- 2024年甘肃省礼县公开招聘合同制交警试题带答案详解.docx
- 2024年贵州省紫云苗族布依族自治县公开招聘合同制交警试题带答案详解.docx
- 2024年甘肃省临潭县公开招聘合同制交警试题带答案详解.docx
文档评论(0)