- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 信息检索合作业陈磊.doc
- 信用证欺的风险及防范.doc
- 信用证案分析,含答案.doc
- 信用卡调论文.doc
- 信托财产的法律性质和结构之我见.doc
- 信用集中险研究新进展.doc
- 信息检索业做法.doc
- 信用风险化的种模型.doc
- 信用证结审单准则.doc
- 信阳光山旅游资源列表.doc
- 高中心理健康咨询服务满意度与学校心理健康教育课程实施效果分析教学研究课题报告.docx
- 生成式人工智能在初中化学教学流程优化中的应用研究教学研究课题报告.docx
- 基于实验探究的初中化学教学评价体系优化与创新实践教学研究课题报告.docx
- 《家政服务企业员工培训体系构建中的职业培训模式研究》教学研究课题报告.docx
- 初中戏剧教育与跨学科教学融合的实践研究教学研究课题报告.docx
- 8 《教师职业压力源对教师工作绩效的影响及干预措施研究》教学研究课题报告.docx
- 高中数字素养教育策略研究:教育国际化背景下的实践与反思教学研究课题报告.docx
- 新疆乌鲁木齐市第七十中学2024-2025学年八年级下学期期末语文试题(解析版).docx
- 课间操运动对学生心理素质培养的实证研究教学研究课题报告.docx
- 智慧教育时代家校共育均衡推进:基于AI的沟通平台构建与实践教学研究课题报告.docx
文档评论(0)