- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
朝阳区体中心健康体检注意事项 简单版
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 有色金属业协同OA应用分析.doc
- 有线&无通信技术资料.doc
- 有电有电,没宽带,也能上网。.doc
- 服务业团领导者影响策略之研究.doc
- 服务员的理需求和心理品质.doc
- 服务心理案例.doc
- 有组织的络学习模式探索和学习效果研究.doc
- 服务营销重点整理.doc
- 服务技巧案例分析.doc
- 服务意识务员.doc
- 2025年春北师版七年级下册数学教学课件 第三章 3 等可能事件的概率 第1课时 求简单的等可能事件.pptx
- 2025年春北师版生物七年级下册教学课件 第9章 第1节 人体产生的代谢废物.pptx
- 2025年春北师版生物七年级下册教学课件 第7章 第2节 血液循环(第1课时).pptx
- 2025年春北师版数学八年级下册教学课件 第二章 1 不等关系.pptx
- 2025年春北师版七年级下册数学教学课件 第三章 2 频率的稳定性 第1课时 频率及频率的稳定性.pptx
- 2025年春北师版数学八年级下册教学课件 第四章 3 公式法 第2课时 用完全平方分解因式.pptx
- 1.1幂的乘除(16大题型提分练)(原卷版)-2024-2025学年七年级数学下册同步课堂(北师大版2024).docx
- 2025新七年级道德与法治下册第四单元认识民法典教学设计.docx
- 组织人效诊断干部盘点人才评价发展方案.pdf
- 华为-+以价值创造评价与分配机制来激发组织活力.pptx
文档评论(0)