- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
盘点十大然抗癌食品 吃出健康远离癌症
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 百富餐饮锁的扩张与管控.doc
- 百技通播软件安装使用说明.doc
- 百斯盾发策略分析.doc
- 瘦人增肌身计划攻略.doc
- 百汇嘉业媒总策划张铭峰另类解读影视作品与商战:《满城尽带黄金甲》与营销.doc
- 百货店经策略.doc
- 百货门店销手法对比研究分析.doc
- 百货店促手段分析比较.doc
- 百货招商明会暨品牌推介会方案.doc
- 百龙滩电防洪应急预案.doc
- 二手奢侈品交易平台用户信任度构建策略研究报告.docx
- 聚焦2025年,互联网金融服务平台金融科技赋能与用户体验提升评估报告.docx
- 财政学期末原题+答案.docx
- 2025年社区便民服务综合体社区公共设施建设与维护研究报告.docx
- 深度解析2025:基因检测技术在遗传性心脏病诊断准确性的前沿报告.docx
- 特岗教师综合提升测试卷【易错题】附答案详解.docx
- 云计算产业在2025年的云计算与边缘计算融合趋势报告.docx
- 特岗教师综合提升测试卷【各地真题】附答案详解.docx
- 二手图书市场信用评估与修复策略分析.docx
- 二手奢侈品交易平台2025年鉴定技术升级对品牌价值提升研究.docx
文档评论(0)