- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
第一批,家重大自然灾害应急无人机监测站合作协议签署暨授牌仪式
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 秦汉魏晋北朝档案文献编纂.doc
- 福建省房产业发展研究定稿.doc
- 秦巴生态能保护区多样性现状及主导生态服务功能评价.doc
- 秘书学网形成性系统标准答案任务.doc
- 秦皇岛市境功能区划.doc
- 科技文献索上机实习作业.doc
- 移动互联时代电子商务中的“长尾”现象分析.doc
- 移动协同公软件常识.doc
- 移动终端现状及趋势.docx
- 秦淮河明墙 带状空间分析.doc
- 2025年安徽省滁州市行政职业能力测验模拟试题及答案一套.docx
- 2025年安阳学院单招(语文)测试模拟题库新版.docx
- 2025年安徽省芜湖市单招语文测试模拟题库带答案.docx
- 2025年安徽省池州市单招语文测试模拟题库一套.docx
- 2025年安徽电气工程职业技术学院单招(语文)测试题库最新.docx
- 2025年安徽省合肥市选调生考试(公共基础知识)综合能力测试题及参考答案1套.docx
- 2025年国家电网招聘之电网计算机题库500道及参考答案【基础题】.docx
- 2025年安徽汽车职业技术学院单招(语文)测试模拟题库及完整答案1套.docx
- 2025年安徽省淮北市行政职业能力测验模拟试题及答案1套.docx
- 2025年安徽省六安市单招(语文)测试模拟题库及参考答案一套.docx
文档评论(0)