- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
美国房地产业简介
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking instal
您可能关注的文档
- 网店推广销策略.doc
- 网上报税作流程及注意事项.doc
- 网店策划案淘宝.doc
- 网上转学程操作.doc
- 网易网聚的力量.doc
- 网控直流电源系统介绍.doc
- 网站垂直之路可分三步走.docx
- 网站se维护推广和方法.doc
- 网站建设案协会的网站策划书.doc
- 网络互动大学生社会化的影响分析.doc
- 2025至2030中国飞机磁电机点火系统行业项目调研及市场前景预测评估报告.docx
- 2025至2030中国纺织膜行业发展趋势分析与未来投资战略咨询研究报告.docx
- 2025至2030中国己二腈行业项目调研及市场前景预测评估报告.docx
- 2025至2030中国电池膜产业运行态势及投资规划深度研究报告.docx
- 2025至2030中国紧急救护车行业产业运行态势及投资规划深度研究报告.docx
- 2025至2030数字出版行业发展趋势分析与未来投资战略咨询研究报告.docx
- 2025至2030中国金属铜行业市场发展分析及发展趋势与投资方向报告.docx
- 2025至2030中国机械行业产业运行态势及投资规划深度研究报告.docx
- 2025至2030入门文化行业发展趋势分析与未来投资战略咨询研究报告.docx
- 2025至2030中国窗口运算符行业项目调研及市场前景预测评估报告.docx
文档评论(0)