- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
胃肠道间瘤诊治指南
HYPERLINK / /
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by ser
您可能关注的文档
- 美国零售电商:有机产品零售商的生意经.doc
- 美国房地业简介.docx
- 美容院黑调查.doc
- 美容与化专业申报材料.doc
- 美的空调划书.doc
- 群众入党请书范文.docx
- 群众路线习材料.doc
- 群众路线家谈心得体会.doc
- 羽毛球俱部商业计划书.doc
- 翘臀自己家练出来.doc
- 冷链物流温控技术在食品冷链配送中的应用与质量保障体系研究报告.docx
- 特岗教师考试黑钻押题含完整答案详解(必刷).docx
- 特岗教师考试黑钻押题及完整答案详解(必刷).docx
- 2025年跨境电商物流行业现状与未来趋势:服务模式与市场竞争格局研究报告.docx
- 特岗教师考试黑钻押题及参考答案详解(基础题).docx
- 2025年生物制药行业生物制药行业政策环境与市场影响报告.docx
- 特岗教师考试黑钻押题及答案详解【典优】.docx
- 特岗教师考试黑钻押题及参考答案详解一套.docx
- 2025年,增强现实(AR)在心理健康治疗中的应用创新研究报告.docx
- 2025年社区养老助餐服务标准化体系建设报告.docx
文档评论(0)