- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 苏家屯歌大赛海选策划.docx
- 苏打标准报版本.doc
- 苏教版思品德八级下册《消费者的权益》教案.doc
- 色谱分析离方法概述.doc
- 苏泊尔炊项目建议书终.doc
- 若干争议探讨.doc
- 苦杏仁甙镇痛作用和无身体依赖性研究.docx
- 苏燕雅苏产业结构分析.doc
- 英国DECAM软件的应用及二次开发.doc
- 节约里程的基本原理.docx
- 2025四川湖山电器股份有限公司招聘产品宣传人员1人笔试历年参考题库附带答案详解.docx
- 2025年综合类-财经类-财经类-治税和纳税服务考试历年真题摘选带答案(5套合计100道单选).docx
- 2025苏州大数据有限公司招聘笔试历年参考题库附带答案详解.docx
- 2025年鲁银投资集团股份有限公司招聘笔试历年参考题库附带答案详解.docx
- 2025年综合类-房地产估价理论与方法-第十二章房地产估价程序历年真题摘选带答案(5卷单选题百道集合.docx
- 2025贵州金沙供销集团有限公司人才引进3人笔试历年参考题库附带答案详解.docx
- 2025中国广播影视出版社有限公司招聘应届毕业生笔试历年参考题库附带答案详解.docx
- 2025黑龙江省龙睿资产经营有限公司市场化招聘37人笔试历年参考题库附带答案详解.docx
- 2025东航股份海南分公司校园招聘笔试历年参考题库附带答案详解.docx
- 2025年综合类-海洋知识竞赛-海洋行政执法历年真题摘选带答案(5卷100道合辑-单选题).docx
文档评论(0)