- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 解表类中药分类及应用.doc
- 解析茅台粮液营销盲点为何没成奢侈品品牌.doc
- 解读云南旱那些缺水的日子.docx
- 视频目录载秘籍.doc
- 西餐礼仪葡萄酒礼仪.doc
- 解读新国《生活饮用水卫生标准》.doc
- 西安曲江馆惠宾苑IT解决方案.doc
- 詹从淼 标心动力.doc
- 视得安楼对讲解决方案.doc
- 解馋坊特小吃店计划书.doc
- DB13(J)T 217-2017 医院建筑能耗监管系统技术规程.docx
- DB22_T 3581-2023 消防体技能训练馆建设规范.docx
- DB13(J)T 142-2012 液化石油气一体化设备小型充装站建设管理规范.docx
- T_GDSCEA 001-2023 T_GDJSKB 010-2023 装配式混凝土结构钢筋冷挤压套筒连接技术规程.pdf
- DB22_T 3615-2023 西伯利亚杏播种苗质量分级.docx
- T_GDHS 009-2023 公路桥梁混凝土预制梁静载试验规程.pdf
- T_GDHS 010-2023 桥梁防船撞预警系统性能现场测试方法.pdf
- T_GDHS 011-2024 不中断交通条件下桥梁混凝土结构修复与拼接技术规范.pdf
- DB22_T 3549-2023 老年人助浴服务规范.docx
- DB22_T 3592-2023 冰雪旅游气候资源评价规范.docx
文档评论(0)