- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
认定与产认证申请材料编写指南
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 计算机应基础知识点.doc
- 计算机操系统 作业答案.doc
- 计算机三嵌入式知识点.doc
- 计算机操系统及答案.doc
- 计算机操系统复习知识点汇总.doc
- 计算机技训练大作业计算机科学与技术.doc
- 计算机操系统大纲.doc
- 计算机操系统刘循练习答案.doc
- 计算机操系统实验四.doc
- 计算机操系统应用.doc
- 2025年跨境电商独立站用户体验优化与转化路径分析报告.docx
- 在线教育行业2025年学员流失原因及市场影响分析报告.docx
- 2025年行业报告:合成生物学推动生物基材料产业迈向智能化生产.docx
- 2025年生态旅游度假区跨境智慧运营平台智慧旅游商业模式创新报告.docx
- 文创IP衍生品市场2025年消费趋势与品牌合作模式创新研究报告.docx
- 工业企业元宇宙培训课程体系优化研究报告:2025年实施路径.docx
- 2025年银发教育内容创新与互动式学习方案.docx
- “双碳”背景下绿色金融产品创新模式与市场竞争力研究报告.docx
- 2025年数字经济产教融合型企业认定标准及培育模式创新报告.docx
- 2025年文创盲盒行业风险预警与应对措施研究报告.docx
文档评论(0)