- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
该文档不业核心竞争力状况
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 论信用证诈及信用证欺诈例外原则概述二.doc
- 论公民教与思想政治教育的关系.doc
- 论农地承经营权的物权法律性质与特征.doc
- 论分子生学技术在中医药研究中的应用.doc
- 论决策层执行层.doc
- 论坛网站设技术策划书.doc
- 讲义二:ANUC数控车床基本操作.doc
- 论农村信社信贷风险的防范对策.doc
- 论受虐儿的救赎.doc
- 论劳动合法实施后的招聘录用法律风险论文.doc
- 5.3用频率估计概率(课件)高一数学(湘教版2019必修第二册).pptx
- 第11课 创新思维要善于联想(课件)高考政治一轮复习(新教材新高考).pptx
- 第6课 走进经济全球化 课件-新高考政治一轮复习选择性必修一《当代国际政治与经济》课件.pptx
- 数据库发展研究报告(2025年)-大数据技术标准推进委员会.docx
- AI 智能体运行安全测试标准(中文).docx
- 第四单元 水的三态变化(复习课件)四年级科学上学期期末复习(青岛版).pptx
- 8.1 基本立体图形(第1课时)(课件)高一数学(人教A版2019必修第二册).pptx
- Unit 4 Plants around us第四课时(课件)人教PEP版(2024)英语三年级上册.pptx
- 高三生物一轮复习课件第26讲 基因的表达.pptx
- 专题01 电场力的性质 高二物理上学期期末考点(人教版2019).pptx
最近下载
- 八项规定回头看自查报告.pdf VIP
- 2012北京 第一册市政道路、桥梁工程预算定额.pdf VIP
- 华为LTC流程IPD流程ITR流程三大核心流程变革一篇文章就全明白啦V2.0!.pdf VIP
- 普洱哈尼族彝族自治县2025年数学五年级第二学期期末学业质量监测试题含答案.doc VIP
- D-ZD2010发电厂汽水管道支吊架设计手册制造图册-中国电力规划.pdf VIP
- 产科急救应急预案.docx VIP
- 关于社区卫生服务中心五年发展规划十五五发展规划2025.docx VIP
- NBT 25085-2018 核电厂常规岛焊接技术规程.pdf VIP
- 烟草代办合同范本6篇.docx VIP
- 危险废物污染防治责任制度.docx VIP
文档评论(0)