- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
轻轻松松论文 快快乐乐拿学位
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation loc
您可能关注的文档
- 超强空白人简历模板.doc
- 超滤膜和滤设备在水处理中的应用.doc
- 超市:淡如何留住你的顾客.doc
- 超级女生例分析.doc
- 超市顾客待流程.doc
- 超级计算操作系统.doc
- 超高温灭奶haccp.doc
- 越剧表演才以订单培养为主要形式的充要性分析.doc
- 超龄人员缴所需材料.doc
- 越南语基常用词分类.doc
- 生物科技临床试验2025案例解析:效率提升与实战策略.docx
- 传染病疫苗的研发与应用研究动态.pptx
- 跨境办公用品电商供应链金融创新与跨境物流优化策略.docx
- 康复工程行业智能化升级趋势及2025年市场动态研究报告.docx
- 机械租赁商家合同模板(3篇).docx
- 光伏产业融资现状与投资银行创新业务分析报告2025.docx
- 2025新能源叉车租赁行业跨境数据平台的市场拓展与合作伙伴关系报告.docx
- 智能港口物流技术应用与港口竞争力提升的实证研究报告.docx
- 交通基础设施建设2025年节能减排成本效益分析报告.docx
- 现场演艺市场品牌营销案例,2025年行业经典策略研究报告.docx
文档评论(0)