- 1、本文档共61页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 轻松自编型嵌入式操作系统的附录基础系统源码.docx
- 轴承端盖射模设计说明书正文.doc
- 轮胎维修间风险概述.doc
- 装修学习程 让菜鸟成为专家.doc
- 轻钢结构装方案.doc
- 轿车驾驶验漫谈.doc
- 辅助设备装分部鉴定书.doc
- 软件侵权例及司法鉴定实验模拟.doc
- 辅导教材写要求.doc
- 轿车标志含义大全.doc
- krpano标签动作语言基本语法.pdf
- 参考疗法级纸liture paper 1 slsesotho litting 1.pdf
- 这给出期望期待案例.pdf
- 池塘动物级书由ned jensen撰写angela kamstra-level点读版pond animals.pdf
- 天文计算天空望远镜sky amp telescope.pdf
- 学院财务会计fi14fico interview questions set 14FICO面试问题集.pdf
- 嗨名字姓氏i at成绩剑桥国际青少hx g5connect101.pdf
- 中英对照版带时间轴季s04e07.pdf
- 邀纸显示动态范围管理降低功率改善环境对比度文稿.pdf
- 哈佛公开课幸福.pdf
最近下载
- 消防工程质量监理质量评估报告.docx VIP
- JTT 1516-2024 公路工程脚手架与支架施工安全技术规程.docx VIP
- 咨询服务流程与方法.docx VIP
- 乳制品的生产企业应急预案终稿.pdf
- 北师大版七年级数学下学期期中易错精选50题(解析版)2022-2023学年七年级数学下册重难点专题提优训练(北师大版).docx VIP
- 2023-2024年暨南大学352口腔综合考研真题.pdf VIP
- 110千伏及以下配电网规划技术指导原则(2024年).doc VIP
- 药品常用知识(共18张PPT).pptx VIP
- 医疗质量管理课件.pptx VIP
- 管理学原理配套教材电子课件(完整版).pptx
文档评论(0)