- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
超高层商住楼施工组织设计(筏板基础)
洛阳正大国际城市广场暨市民中心3#.6#楼 施工组织设计
Earth-rock backfilling of 90,000 m3. 6.2 filling large amount of planning and reclamation of the project, considering the construction of specific circumstances, mainly the following aspects: 1, good full filling arrangement and construction of roads to ensure filling the roads. 2, the main excavation, loading, transport, construction machinery, including leveling and compaction are put in good performance of construction machinery and equipment, to meet the construction needs. Earth-rock Backfilling is mainly based on general progress in the concrete construction of the main project to schedule. 6.3 Earth-rock backfilling construction of Earth-rock backfilling construction carried out in the following way: soil-stone embankment in the corresponding parts of the concrete pouring is completed, dam Foundation excavation of sand and gravel material, transported by CAT320 dig dump truck mounted 5~10T to fill parts of unloading, mechanical compacting. The Earth-rock backfilling primarily for structural backfill and site filling, relatively low requirements for compaction of backfill, the proposed CAT320 dig dump truck mounted 5~10T brought on to the site, bulldozers and tiered rolling. Layer thickness 50cm thickness of rolling a few times and identification. Local corner is supplemented by frogs Rammer and tamping. Filling quality control are as follows: (1) backfill material is not allowed in mixed clay, grass, wood, and other harmful substances. (2) the backfill material shall conform to the requirements of supervision engineer in construction drawings and. (3) the backfill material layer thickness is not too thick, should meet the requirements. (4) the compacting should pay particular attention when rolling quality backfill sand and gravel, the compact requirements. 6.4 6.4.1 construction quality guarantee measures of quality and safety measures (1) strictly control th
您可能关注的文档
最近下载
- 手术室规章制度33项汇编.pdf VIP
- “互联网+”背景下高校辅导员学业指导与职业规划工作的创新-来源:现代职业教育(高职高专)(第2020040期)-山西教育教辅传媒集团有限责任公司.pdf VIP
- 劳动实践(教案)二年级上册综合实践活动全国通用.docx VIP
- 2024年湖北省华师一附中自主招生数学试题(d含答案).pdf VIP
- 新教科版六上科学1-2《怎样放得更大》练习题(含答案).docx VIP
- 冶金消防安全知识课件.pptx
- 《电力设备典型消防规程》(DL5027—2024).pptx VIP
- 罗马城邦和罗马帝国ppt课件.pptx VIP
- 迅达5400综合系统介绍(2).pdf
- 新教科版六上科学知识点+练习题-1.2《怎样放得更大》.doc VIP
文档评论(0)