包头第二热电厂2×200MW机组烟气脱硝改造工程(仪表)施工组织设计
PAGE
PAGE \* MERGEFORMAT 41
包头第二热电厂2×200MW机组烟气脱硝改造工程
施工组织设计(方案)
(仪表专业)
批准:
审核:
编制:
山东菏建建筑集团有限公司
2014年09月10日
目 录
1、工程概况··········································2
2、施工组织及劳动力计划······························4
3、施工机具配置计划··································6
4、仪表主要施工方案··································7
5、工期及进度计划···································28
6、技术管理··················??······················30
7、安全、质量目标及保证措施·························31