- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
CAP311RAIRPOLLUTIONCONTROL(CONSTRUCTIONDUST)REGULATION1
CAP 311R AIR POLLUTION CONTROL (CONSTRUCTION DUST) REGULATION一
摘要:本文主要介绍了CAP 311R AIR POLLUTION CONTROL (CONSTRUCTION DUST) REGULATION的主要内容。
(Cap 311 section 43)
[16 June 1997] L.N. 304 of 1997
(L.N. 127 of 1997)
Cap 311R s 1 (Omitted as spent)
(Omitted as spent)
Cap 311R s 2 Interpretation
(1) In this Regulation, unless the context otherwise requires-
construction site (建造工地) means a place where construction work is or is intended to be carried out and includes any area, whether located in such a place or elsewhere, that is used for the storage of-
(a) dusty materials or plant used or intended to be used for the purpose of the construction work; or
(b) dusty materials produced as a result of the construction work being carried out;construction work (建造工程) means-
(a) the construction, demolition, reconstruction, shoring, alteration, maintenance or repair of the whole or any part of any arch, bridge, building, chimney, dock, hoarding, shelter, tunnel, wall, pier, wharf or other structure or any road, slope, embankment, street, railway, tramway, airport, channel, drain, service lane, water conduit, lighting or public utility;
(b) dredging;
(c) the extraction from the earth of any matter whatsoever;
(d) piling;
(e) quarrying;
(f) reclamation;
(g) site formation;
(h) any work involved in preparing for any operation of the type referred to in paragraph (a), (b), (c), (d), (e), (f) or (g); and
(i) the use of machinery, plant, tools, gear and material in connection with or for any operation referred to in paragraph (a), (b), (c), (d), (e), (f), (g) or (h);contractor (承建商) means any person or firm engaged in carrying out construction work by way of trade or business, either on his own account or pursuant to a contract or arrangement entered into with another person or firm, including the Government or any public body;
dusty materials (易生尘埃物料) includes cement, earth, pulverized fuel ash, aggregates, silt, stonefines, sand, debris,
文档评论(0)