- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Fevoc全国经济专业技术资格考试试卷人力资源管理专业知识与实务
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should bePAGE 130
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casi
您可能关注的文档
- Aechzwt中国经济管理大学学员课件某企业物流部组织机构图与岗位职责描述.doc
- aknfvea中山大学微观经济学与管理学原理考研试题答案.doc
- ajdpdk会计毕业论文现行经济环境下会计计量模式的探讨.doc
- ajozgmb中国经济管理大学学员课件某企业项目部组织机构图与岗位职责描述.doc
- Akypxeaa初级经济师金融专业知识与实务练习题.doc
- Aecgrrk中国经济管理大学学员课件某企业生产部组织机构图与岗位职责描述.doc
- ajovtxa中国经济管理大学学员课件某企业物流部组织机构图与岗位职责描述.doc
- a工业设备及管道绝热工程质量的检验评定标准.doc
- Bkagiek经济师人力资源管理专业知识与实务考试大纲.doc
- bd通信信息业务员初级试卷正文.doc
- 2025AACR十大热门靶点推荐和解读报告52页.docx
- 财务部管理报表.xlsx
- 高中物理新人教版选修3-1课件第二章恒定电流第7节闭合电路欧姆定律.ppt
- 第三单元知识梳理(课件)-三年级语文下册单元复习(部编版).pptx
- 俄罗斯知识点训练课件-七年级地理下学期人教版(2024).pptx
- 课外古诗词诵读龟虽寿-八年级语文上学期课内课件(统编版).pptx
- 高三语文二轮复习课件第七部分实用类文本阅读7.2.1.ppt
- 高考物理人教版一轮复习课件第4章第3讲圆周运动.ppt
- 高考英语一轮复习课件53Lifeinthefuture.ppt
- 2025-2030衣柜行业风险投资发展分析及投资融资策略研究报告.docx
文档评论(0)