- 1、本文档共23页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
GAPCR良好农业规范认证特别规则Ver改
WIT ASSESSMENT
GAPCR01 Rev. 3.1 Issue: 04/01/2009
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings alongPAGE 22
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to
您可能关注的文档
- Aechzwt中国经济管理大学学员课件某企业物流部组织机构图与岗位职责描述.doc
- aknfvea中山大学微观经济学与管理学原理考研试题答案.doc
- ajdpdk会计毕业论文现行经济环境下会计计量模式的探讨.doc
- ajozgmb中国经济管理大学学员课件某企业项目部组织机构图与岗位职责描述.doc
- Akypxeaa初级经济师金融专业知识与实务练习题.doc
- Aecgrrk中国经济管理大学学员课件某企业生产部组织机构图与岗位职责描述.doc
- ajovtxa中国经济管理大学学员课件某企业物流部组织机构图与岗位职责描述.doc
- a工业设备及管道绝热工程质量的检验评定标准.doc
- Bkagiek经济师人力资源管理专业知识与实务考试大纲.doc
- bd通信信息业务员初级试卷正文.doc
最近下载
- 吻合器应用的有关问题.ppt
- 2024秋国开《法律职业伦理》形考任务一至三答案.docx VIP
- 《党政机关厉行节约反对浪费条例》详细内容学习(PPT+文稿).pptx VIP
- 油库DCS控制系统.pptx VIP
- 世界职业院校技能大赛「参赛项目介绍内容」模拟示例参考—项目名称:生命之桥.docx VIP
- (新平台)国家开放大学《幼儿园教育质量评价》形考任务1-3参考答案.pdf VIP
- 上海交通大学网络护理管理学习题册答案.pdf VIP
- 液化气公司(燃气站)安全生产三项制度完整版.doc VIP
- 生物质发电锅炉设备原理方案.doc
- 2025年《党政机关厉行节约反对浪费条例》PPT学习课件.pptx VIP
文档评论(0)