- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
ID共有产权经济适用房运作体系研究
position for future reference. Installation using special lifting pole rotor rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. shaft coupling .1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along
position for future reference. Installation using special lifting pole rotor rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before th
您可能关注的文档
- Aechzwt中国经济管理大学学员课件某企业物流部组织机构图与岗位职责描述.doc
- aknfvea中山大学微观经济学与管理学原理考研试题答案.doc
- ajdpdk会计毕业论文现行经济环境下会计计量模式的探讨.doc
- ajozgmb中国经济管理大学学员课件某企业项目部组织机构图与岗位职责描述.doc
- Akypxeaa初级经济师金融专业知识与实务练习题.doc
- Aecgrrk中国经济管理大学学员课件某企业生产部组织机构图与岗位职责描述.doc
- ajovtxa中国经济管理大学学员课件某企业物流部组织机构图与岗位职责描述.doc
- a工业设备及管道绝热工程质量的检验评定标准.doc
- Bkagiek经济师人力资源管理专业知识与实务考试大纲.doc
- bd通信信息业务员初级试卷正文.doc
最近下载
- 统编版八年级下册历史期末专题训练:选择题(含答案).docx VIP
- 初二八年级下学期期末家长会PPT课件.ppt VIP
- 数据结构 期末考试试卷.doc VIP
- 学习强国深圳经济特区建立40周年题库及答案.docx VIP
- 云南师范大学2020-2021学年第1学期《数据结构》期末考试试卷(A卷)含标准答案.docx
- 从军行之四翻译及注释 从军行赏析王昌龄.pdf VIP
- 2025年广东省高考物理真题卷(含答案与解析).pdf VIP
- 四年级语文下册1-8单元达标检测卷(人教)附答案(好卷).docx
- 中国人寿财产保险股份有限公司道路危险货物承运人责任保险条款.pdf VIP
- 部编版小学语文1-6年级日积月累整合.doc VIP
文档评论(0)