- 1、本文档共20页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中级经济师考试房地产经济专业知识与实务考前突破卷1
考中级经济师到鸭题库YaTiK做精准试题,更多押题资料下载
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre str
您可能关注的文档
- 世纪中国农业.doc
- 世界经济信息周刊期总第期.doc
- 东北财经大学专升本入学考试国际经济与贸易专业综合及技能课考试大纲.doc
- 东北财经大学国际经济与贸易专升本考试大纲.doc
- 东北财经大学专升本考试大纲信息管理与信息系统.doc
- 世纪服装流行与社会经济文化的关系.docx
- 、第一单元中国古代的农耕经济.doc
- 专业技术人员信息化能力建设公共课在线考试试题及答案.docx
- 中传传媒经济学考研大纲.doc
- 中国农业工作九大重点.doc
- AI芯片在人工智能教育领域的应用与市场前景报告.docx
- 2023年度河北省单招考试一类 《文化素质数学》题库及答案详解(真题汇编).docx
- 2023年度河北省单招考试一类 《文化素质数学》题库及参考答案详解【培优B卷】.docx
- 特斯拉新能源汽车产业链上下游企业合作模式与2025年发展分析报告.docx
- 2025年跨境电商数据合规性对国际贸易风险管理的影响报告.docx
- 跨境电商办公用品电商仓储机器人应用对仓储作业效率的影响报告.docx
- 2023年度河北省单招考试一类 《文化素质数学》题库【各地真题】附答案详解.docx
- 2023年度河北省单招考试一类 《文化素质数学》题库及参考答案详解(综合卷).docx
- 2023年度河北省单招考试一类 《文化素质数学》题库及参考答案详解1套.docx
- 术后康复智能护膝相关项目建议书.docx
最近下载
- 用人单位劳动合同模板.doc VIP
- 华熙生物-投资价值分析报告:全球最大透明质酸生产商的产业链延伸.pdf VIP
- 20200522-中信证券-华熙生物-688363-投资价值分析报告:研发驱动,服务美好生活.pdf VIP
- 医药生物行业:华熙生物,全球透明质酸领军企业.docx VIP
- 2025年校园监控系统方案(四篇).pdf VIP
- 2025广西公需科目考试答案(3套涵盖95-试题)一区两地一园一通道建设人工智能时代的机遇与挑战.docx VIP
- 华熙生物-投资价值分析报告-透明质酸,供需双振_20200413.pdf VIP
- 2025年校企合作实训项目设计与实施案例报告.docx
- 华熙生物-投资价值分析报告-全球透明质酸龙头,积极延伸医疗美妆终端.pdf VIP
- 重庆市巴蜀初一入学分班语文试卷版.doc VIP
文档评论(0)