- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中级经济法第七章随堂练习
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +
您可能关注的文档
- 中级会计职称考试中级经济法模拟题六.docx
- 中级会计职称考试中级经济法考前冲刺卷三.docx
- 中级会计职称考试中级经济法知识点:第七章企业所得税法律制度.doc
- 中级会计职称考试中级经济法考前冲刺卷六.docx
- 中国消防产品市场准入信息网系统操作手册.doc
- 中级会计职称经济法预测试题中大网校.doc
- 中级会计职称考试经济法冲刺模拟试题二含答案.doc
- 中级会计经济法真题及答案解析.doc
- 中级会计职称考试经济法考题.doc
- 中级会计职称考试经济法真题第一部分.doc
- 5.2走向人地协调——可持续发展+课件-+2024-2025学年高一地理下学期+人教版(2019)必修第二册.pptx
- 14 2025届湖南省岳阳市高三上学期教学质量监测(一)历史试题(原卷版及答案).docx
- 5.1+人类面临的主要环境问题(优质课件)-【爱上地理课】2024-2025学年高一地理下学期同步优质课件(人教版2019必修第二册).pptx
- 湖南省衡阳市2024-2025学年上学期高三第一次模拟考试历史试卷.docx
- 15 2025届湖南省张家界市高三上学期综合模拟调研(一)历史试题(原卷版及答案).docx
- 2024-2025学年湖南省长沙市高三上期历史模拟试卷.docx
- 湖南省长沙一中2024-2025学年高三上学期第一次模拟考试历史试卷.docx
- 6 2025届湖南省衡阳市衡阳县第一中学高三上学期第一次模拟考试历史试题(原卷版及答案).docx
- 5.2+走向人地协调—可持续发展(优质课件)-【爱上地理课】2024-2025学年高一地理下学期同步优质课件(人教版2019必修第二册).pptx
- 巡察整改措施中存在的不足.docx
文档评论(0)