- 1、本文档共62页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
会计考试经济法基础应试指南模拟题部分
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +1
您可能关注的文档
- 中级经济师考试人力资源管理专业知识与实务模拟真题.doc
- 中级经济师考试人力资源管理专业知识与实务最新预测试卷.doc
- 中级经济师考试中级旅游专业真题及答案.doc
- 中级经济师考试人力资源管理专业知识与实务考前必做试卷.doc
- 中级经济师考试中级工商管理讲义.doc
- 中级经济师考试人力资源管理押密试卷中大网校.doc
- 中级经济师考试人力资源管理专业知识与实务成功过关试题.doc
- 中级经济师考试人力资源考前模拟试题.doc
- 中级经济师考试人力资源管理专业知识与实务真题及答案.doc
- 中级经济师考试农业经济专业知识与实务高频考点试题.doc
- 区域协调发展中的低空经济驱动因素.docx
- 尺寸大小210mmx285mm全彩颜色以去蓝色为主见.pdf
- 高校教师资格证之《高等教育法规》自测题库及答案详解(典优).docx
- 高校教师资格证之《高等教育法规》试题(得分题)及答案详解(有一套).docx
- 塑料桶生产线项目实施方案(范文).docx
- 小升初数学 素养测评卷 提高卷(原卷+答案与解释)2024-2025学年年小升初数学 (人教版).docx
- 氢能源驱动汽车2025年全生命周期碳足迹影响评估报告.docx
- 高校教师资格证之《高等教育法规》自测题库及参考答案详解ab卷.docx
- 2025年植物组织培养技术产业竞争格局与发展战略报告.docx
- 高校教师资格证之《高等教育法规》自测题库及一套答案详解.docx
文档评论(0)