- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
刘诗白政治经济学第版课后习题详解第十四章经济增长与经济发展
Born to win
经济学考研交流群 点击加入
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/
您可能关注的文档
- 中级经济法·第三章.doc
- 中级经济师考试邮电经济专业知识与实务高频考点试题.doc
- 中级经济师运输经济水路专业知识与实务真题.doc
- 中级经济法考试大纲.doc
- 九级政治全册第三单元第七课关注经济发展习题精选新人教版.doc
- 中级经济法第七章随堂练习.doc
- 二级注册建筑师考试法律法规经济与施工.doc
- 中级经济师金融专业与务实备考单选练习.doc
- 二级建造工程师考试网上辅导建设工程施工管理施工信息管理.doc
- 云南初中信息技术五大模块复习资料:总结计划汇报设计可编辑.doc
- 2025年休闲食品健康化转型下的市场拓展策略与渠道创新报告[001].docx
- 农村电商服务站品牌建设:2025年运营模式创新与品牌传播报告.docx
- 2025年互联网金融平台合规整改与金融科技监管的合规监督与可持续发展策略.docx
- 2025年短视频平台内容监管与平台社会责任关系研究报告.docx
- 农产品溯源体系在农产品质量安全监管中的信用体系构建与实施策略研究.docx
- 2025年工业互联网平台数据备份与恢复策略创新方案探讨.docx
- 2025年线上法律咨询服务平台法律咨询行业竞争策略研究.docx
- 农业产业集群农产品流通体系构建与发展机制报告.docx
- 智能制造领航者:2025年3D打印技术在规模生产中的应用效果分析报告[001].docx
- 农村金融服务创新与农村金融消费者权益保护法规实施效果分析报告.docx
文档评论(0)