- 1、本文档共22页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
初级会计职称经济法基础模拟真题1
学会计,考会计到鸭题库YaTiK每天免费直播上课,更多押题资料下载
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2.
您可能关注的文档
- 人事厅培训项目投资估算和经济效益讲课稿.doc
- 代的美国经济.doc
- 份信息参考.doc
- 任宜东文化用品库存管理信息系统文档需求分析说明书.doc
- 份服装行业经济运行概述.doc
- 企业信息管理师复习资料最后定稿.doc
- 企业信息管理期末复习重点专科.doc
- 企业会计信息化工作规范部分答案.doc
- 企业信息管理形成性考核册答案本科.doc
- 份莫遥汽车营销信息简报DOCP.doc
- 剧本杀行业报告:内容创作规范与剧本市场拓展策略.docx
- 剧本杀行业区域市场区域文化特色与市场潜力分析报告.docx
- 剧本杀行业区域市场拓展实战案例研究.docx
- 剧本杀行业区域市场拓展路径与模式探索报告.docx
- 剧本杀行业区域市场竞争态势与品牌差异化策略研究报告.docx
- 剧本杀行业2025年西北区域市场市场细分领域竞争态势与品牌竞争策略分析研究报告.docx
- 剧本杀行业2025年西北市场拓展前景预测报告.docx
- 剧本杀行业2025年长沙市场发展潜力分析报告.docx
- 剧本杀行业2025年长三角市场竞争策略与布局分析.docx
- 医疗行业数据合规:2025年数据安全法实施后的合规监管挑战与应对.docx
最近下载
- 《第一单元 生活中的音乐学习项目二 音乐开启心灵之窗》教案(表格式)七年级音乐人教版(2024新版).pdf VIP
- 成功标书大餐——15份浙江省自然科学基金申请书.pdf VIP
- (辽宁富士电梯)系统故障代码及说明.doc VIP
- 2025版高考政治全程一轮复习必修2第一单元生产资料所有制与经济体制第一课我国的生产资料所有制课件.pptx VIP
- 陕西省专业技术人员继续教育2025公需课《党的二十届三中全会精神解读与高质量发展》20学时题库及答案.docx VIP
- 伤口换药护理操作.pptx VIP
- 贵州01-贵州省居住建筑节能设计标准DBJ52-49-20082.pptx VIP
- 《2023年度中国展览数据统计报告》.docx
- 城市名居商住楼房地产估价报告.doc VIP
- [说明]富士变频器维修与故障处理.doc VIP
文档评论(0)